Creative Simulation Long Lead Soft Fishing Lure
Creative Simulation Long Lead Soft Fishing Lure
Creative Simulation Long Lead Soft Fishing Lure
Creative Simulation Long Lead Soft Fishing Lure
Creative Simulation Long Lead Soft Fishing Lure
Creative Simulation Long Lead Soft Fishing Lure
Creative Simulation Long Lead Soft Fishing Lure
Creative Simulation Long Lead Soft Fishing Lure
Creative Simulation Long Lead Soft Fishing Lure
Creative Simulation Long Lead Soft Fishing Lure
ecom-no-replace-1u4K7quKBOstar-rate
4.9 (42 reviews)

Creative Simulation Long Lead Soft Fishing Lure

$10.33
-{price}%
Product information: Supply category: spot Product Category: Fishing Bait Material: Lead head + PVC injection Size: 12cm Packing: bagged Weight: about 8.5g Applicable people: general Color: pink style, yellow body orange back style, red head luminous style, white style, transparent style Features: Exquisite workmanship, modeling simulation Packing list: Fishing lure*1...
  • High Quality

  • Soft and Durable

  • All Day Comfort

Color
  • Pink
  • Red
  • Transparent
  • White
  • Yellow
Los Angeles, CA
Delivery
Tomorrow, 25 March
9$
In Store
Today, 24 March
Free
Free Returns
The right of withdrawal may be exercised within 14 working days from the delivery date. 
Secured Payments
Style now, pay later! with Atome or Grab PayLater.
ecom-no-replace-Mols0BPqi9payments

Description

Button-up shirt sleeves and a relaxed silhouette. It’s tailored with drapey, crinkle-texture fabric that’s made from LENZING™ ECOVERO™ Viscose — responsibly sourced wood-based fibres produced through a process that reduces impact on forests, biodiversity and water supply.
Features
  • Front button placket
  • Adjustable sleeve tabs
  • Babaton embroidered crest at placket and hem
Materials Care
  • Content: 100% LENZING™ ECOVERO™ Viscose
  • Care: Hand wash
  • Imported
Laundry Care
  • ecom-no-replace-RdILSTTcWhft-ic-d1

    Machine wash max. 30ºC. Short spin.

  • ecom-no-replace-ccCwnMIWuqft-ic-d2

    Iron maximum 110ºC.

  • ecom-no-replace-SxFCLJnN43ft-ic-d3

    Do not bleach/bleach.

  • ecom-no-replace-tm4rixVQ7jft-ic-d4

    Do not dry clean.

  • ecom-no-replace-1d9K5roT8oft-ic-d5

    Tumble dry, medium hear.

Reviews

Reviews

ecom-no-replace-1u4K7quKBOstar-rate
23 Jul 2025
Perfect for Travel and Daily Use
Alexander - Verified Buyer
I’ve been using this power bank for over a month now, and it’s been a lifesaver! It charges my phone about three times on a single charge
ecom-no-replace-1u4K7quKBOstar-rate
20 Jul 2025
Great product.
Emily - Verified Buyer
I’ve been using this power bank for over a month now, and it’s been a lifesaver! It charges my phone about three times on a single charge
ecom-no-replace-1u4K7quKBOstar-rate
21 Jun 2025
Perfect for Travel and Daily Use
Roberth - Verified Buyer
I’ve been using this power bank for over a month now, and it’s been a lifesaver! It charges my phone about three times on a single charge
ecom-no-replace-1u4K7quKBOstar-rate
12 Jun 2025
Perfect for Travel and Daily Use
Vince - Verified Buyer
I’ve been using this power bank for over a month now, and it’s been a lifesaver! It charges my phone about three times on a single charge
ecom-no-replace-1u4K7quKBOstar-rate
15 Jul 2025
Perfect for Travel and Daily Use
Michael - Verified Buyer
I’ve been using this power bank for over a month now, and it’s been a lifesaver! It charges my phone about three times on a single charge
ecom-no-replace-1u4K7quKBOstar-rate
28 Jun 2025
Perfect for Travel and Daily Use
Henry - Verified Buyer
I’ve been using this power bank for over a month now, and it’s been a lifesaver! It charges my phone about three times on a single charge

Returns

Shipping

3 – 7 business days for delivery to metro locations. 7 – 10 business days to regional locations including WA, QLD and NT 4 to 7 business days for delivery to metro locations. 7 to 10 business days to regional locations including WA, QLD and NT. 

Free delivery on orders $99 and over. 

Express* $12.95 Delivery will occur between 9am – 5pm the next business day when you place an order before 12pm AEST

Shipping & Returns

Returns it

The right of withdrawal may be exercised within 14 working days from the delivery date. 

In case that the reason for the return should not be related to a malfunction/defect of the product but rather to an afterthought/error of the measure chosen, the return costs are at the buyer's expences; he/she can then choose the shipping method he/she prefers. 

The refund will be free of charge, will be managed in the shortest time and will occur in any case within thirty days from the delivery date of the return item. 

We remind you that the right of withdrawal lapses for personalized products.